Construction Logistics: Can Construction Packages Improve Profit Margins?

news and press

Construction Logistics: Can Construction Packages Improve Profit Margins?

Construction logistics play a crucial role in the efficiency and profitability of construction projects. Data shows that, on average, 15% of a project's foundation costs are allocated to logistics expenses. Additionally, recent research from ABN AMRO indicates that failure costs account for approximately 5% of total costs. Given the average profit margin of just 3% (2024), these combined 18% in logistics and failure costs pose a serious threat to profitability.

Since these costs do not impact the quality of the construction project or material selection but solely affect cost structure, there is a significant opportunity to improve profit margins.



Failure Costs and Logistical Inefficiencies

Failure costs in construction arise from various factors, the majority of which are linked to inefficient material management, poor inventory control, delayed deliveries, miscommunication, non-compliant materials, and the subsequent repair costs.

Regarding logistics costs—particularly the transportation of materials to the construction site—there is a potential savings of up to 50% through more efficient load combinations. Currently, trucks are only 60% loaded on outbound trips, and many return empty. This highlights a considerable optimization opportunity.


The Added Value of Construction Packages

Construction packages, consisting of prefabricated components, are assembled at an offsite location before being transported to the construction site. Construction hubs serve as such locations, allowing companies to avoid allocating their own personnel or space for assembly.

While prefabricated concrete structures have been in use for some time, construction packages can also play a decisive role in serial projects. Examples include row houses with standardised kitchens, bathrooms, or installations. Grouping materials and components per construction phase offers significant advantages:


a kitchen construction package
a kitchen construction package

Faster Construction Time

Since construction packages are pre-produced and assembled in a controlled environment, onsite construction time is significantly reduced. This minimizes dependence on weather conditions and logistical complications, enabling projects to proceed faster and more efficiently.


Less Space Required on Site

With just-in-time delivery of construction packages, less storage space is needed on-site, contributing to a more organized and efficient workspace while lowering costs.


Lower Costs and Fewer Construction Errors

  • More efficient production reduces unit costs.

  • Less specialized labor required on-site.

  • Reduced material waste due to precise production.

  • Higher quality control in construction hubs, reducing errors and repair costs.


Sustainability and Environmental Benefits

  • Less material waste through optimized resource use.

  • Lower CO₂ emissions due to shorter construction times and fewer transport movements.

  • Emission-free deliveries via construction hubs reduce environmental impact in urban areas.


Consistent Quality and Safety

  • Strict quality controls in the factory ensure consistent performance.

  • Lower risk of structural defects through pre-tested modules.

  • Safer work environment due to reduced intensive labor on-site.


Flexibility and Design Freedom

  • Modular construction allows customization within standardization.

  • Variations in materials, layouts, and finishes are possible without losing efficiency.

  • Suitable for both large-scale projects and small-scale custom solutions.


Reduced Weather Dependence

As the majority of production takes place in a controlled environment, delays due to bad weather conditions are minimized. This leads to a more predictable schedule and a more efficient construction process.


Conclusion

Construction packages provide a strategic solution to common challenges in the construction sector. Experience shows that companies that correctly integrate construction packages into their logistics processes achieve a 5% saving on the previously mentioned 18% in failure and logistics costs.

Utilising construction hubs for pre-assembled packages translates directly into profit!

Comments


Logistics bouwhubs construction hubs

Let's Connect

Qonnected Logistics B.V.

Stationsplein 45

3013 AK Rotterdam

The Netherlands

+31 10 710.61 12

book an online meeting

terms & conditions

privacy rules

Contact us

© 2024. See Disclaimer & copyright for more information.

Qonnected, "Q" or Qonnected Logistics refers to one or more of Qonnected Mobility BV, a Dutch private limited company , its network of member firms, partners and their related entities. Each of its member firms are legally separate and independent entities.  Services can be provided by independent subsidiaries, affiliates or Partners of Qonnected Mobility BV an entity which is registered with the trade register in The Netherlands under number 88424561.

Data LocationEU - Frankfurt

HIPAA Compliant (US Only)No -

Compliant Agreements EU Data Processing Agreement & Sub-Processor List:

read our privacy policy and user agreements (subject to terms) © 2024

  • blueskylgo_edited
  • X
  • Facebook
  • LinkedIn

© 2024 by QONNECTED LOGISTICS & MOBILITY

bottom of page